That this House has considered the building safety remediation of residential buildings.
It is a pleasure to serve under your chairmanship, Dr Murrison. I thank the Backbench Business Committee for granting this debate, and all right hon. and hon. Members for their participation.
More than nine years after Grenfell claimed all those lives, we must ask whether the system that is intended to protect residents and deliver the safety and security they deserve is truly working. There has been progress. The Building Safety Act 2022, the Building Safety Regulator and remediation funding have strengthened our collective national response, but legislation must lead to safer homes, funding must lead to completed works and residents must be able to move forward with their lives.
Today, I will address three interconnected issues: the protection of residents during remediation, the operation of PAS 9980 and the competence of those making critical safety decisions, and the position of non-qualifying leaseholders. I will begin by drawing on an experience directly connected to my constituency. Surrey Heath is, by any definition, a semi-rural consistency, where one would not necessarily have expected this issue to rear its head, yet the correspondence reaching my office from Camberley, our principal market town, shows how deeply the problem affects ordinary households across the UK. We must judge the system by the experience of the residents who depend on it. At Dorchester Court, one of my constituents has lived in their shared ownership home for 20 years. They are unwell, unemployed and at risk of losing that home. They need to sell, but unresolved building safety and EWS1 issues have taken that choice away.
Another resident has lost two prospective buyers because lenders would not offer mortgages on that property. Cala Homes, the original developer, has accepted full responsibility for life-critical remediation, but residents say that they still have no clear timetable for those works to be delivered or completed. Accepting responsibility is only the beginning. Until the required work is completed, residents remain trapped. It is a repeat pattern across the country. People need to move because of illness, unemployment, caring responsibilities or just simple changes in family circumstances. Their lives cannot be placed on hold indefinitely while developers, building owners and managing agents decide what happens next.
I can think of at least two buildings in my constituency that have been determined urgent life-critical but cannot be remediated because of delays in getting the certificates they need from the Building Safety Regulator. That leaves residents facing large insurance costs, unable to sell, and stuck with damp and mould and a whole range of other issues. Does the hon. Member agree that the Building Safety Regulator needs the resources so that residents are not left trapped in their homes for years?
I am incredibly grateful to the hon. Lady, who I know represents a Bournemouth seat. I have exactly the same issues in my constituency. Reports and certification are not being received in time, often frustrating sales and driving things like insurance premiums in the long term. Residents’ lives cannot be placed on hold indefinitely while those who have the whip hand decide what happens next.
The problems do not end when remediation begins. At North Court, another development in Camberley, residents undergoing remediation through the Metropolitan Thames Valley housing association have reported restricted daylight and ventilation, broken windows and water leaks. Those issues are challenging at the best of times, but almost unbearable during a long, hot summer like the one we have just had, when temperatures inside properties regularly reached 40ºC.
Some residents have described deteriorating mental health and feeling increasingly insecure in their own homes. Scaffolding, sheeting, noise and disruption may be unavoidable for a time, but poor communication, unresolved damage and unhealthy living conditions are not acceptable. Clear information, prompt repairs and credible completion dates should be basic expectations throughout the remediation process. I ask the Minister to outline how residents will be protected during remediation works, especially during hot summer periods and cold winters.
I am struck that the hon. Member used the phrase “collective national response” to start his remarks. As a Scottish MP, I am conscious that this is a UK-wide endeavour, but four different Governments could be looking at it. If work is accelerated in one part, pressure can be put on the resources available in another. Does the hon. Member agree that the collective national response has to be considered in a UK sense, not just under the relevant Department in Westminster?
The Public Accounts Committee looked at this issue on 21 March 2025. One of our conclusions was:
“Given the lack of progress to date and the remaining challenges ahead, we are sceptical about the adequacy and achievability of MHCLG’s Remediation Acceleration Plan.”
The hon. Gentleman is right to say that one main handbrake to remediation is national resourcing. There are simply not enough fire safety engineers or specialist companies that can do this remediation work on a fast timescale. That problem exists not only between Scotland and England but within the English regions. I entirely accept the hon. Gentleman’s point that a co-ordinated national solution is the best response we could hope for for our residents, so that the work is undertaken in a timely and efficient manner.
My second question for the Minister relates to that topic. How will those responsible be held to enforceable timetables, so that residents have certainty and transparency from companies completing the remediation works? The examples I have cited concern the pace and conditions of remediation but, before any work begins, someone must decide what work is required.
That brings me to PAS 9980, the framework used to assess fire risks in the external walls of existing residential buildings. The Government have committed to making the standard mandatory for relevant external wall fire risk assessments, but its interpretation will influence the work that is carried out, the funding available and the conditions in which residents are expected to live. A proportionate approach is sensible. Assessors should consider the building as a whole, including its materials, construction and wider fire safety arrangements.
The hon. Member talked about publication of the audit, with which I hope everyone will agree. Does he agree that it should be shared across the nations of the UK in order that all our Executives—the Parliaments in Scotland and Wales and the Executive in Northern Ireland—can take action where that is appropriate?
I am grateful to the hon. Gentleman. He parallels the case made by the hon. Member for Stirling and Strathallan (Chris Kane). There has to be a national-level approach, and I hope that the Government will share information with the devolved Administrations in all parts of the United Kingdom and with all Members of this House so that we can adequately support the affected residents, who are certainly not just in England.
The experience with the separate EWS1 process shows what happens when confidence in these professionals breaks down. One Surrey Heath constituent accepted an offer on their apartment for £260,000. That was for a flat originally bought for £316,000. They were prepared to accept a loss of £56,000 simply to move forward with their life, but even then the sale collapsed, because the buyer could not obtain a mortgage after lenders stopped accepting the building’s EWS1 form, which had been signed by the now notorious Adam Kiziak of Tri Fire Ltd. The Institution of Fire Engineers suspended Mr Kiziak’s membership and registration in 2024, following findings under its disciplinary process. It announced his expulsion on 5 March 2025, following even more complaints. Also in March 2025, alongside my hon. Friend the Member for St Albans (Daisy Cooper), I met the then Building Safety Minister to raise concerns about Mr Kiziak and his behaviour.
My office has identified at least nine EWS1 forms issued through Tri Fire in Camberley alone that have subsequently been rejected by lenders. That is why independent verification is essential, including where an earlier assessment concluded that no remediation was required, because we now know that Adam Kiziak was faking EWS1 forms, suggesting that buildings were entirely safe when they in fact contained combustible material.
It is a pleasure to serve under your chairship, Dr Murrison, and a delight to be called first. I congratulate the hon. Member for Surrey Heath (Dr Pinkerton) on securing this important debate. It is an important opportunity for me to raise with the Minister the many issues that my constituents are facing, which are similar to those that the hon. Member has just described. I welcome the Minister to her place as well. In having this debate, we remember all the victims and survivors of Grenfell.
I also thank all the people across the country who have been campaigning on cladding. I have talked about cladding many times and yet we are still here; that is my frustration. I thank the previous Minister for Building Safety, my hon. Friend the Member for Chester North and Neston (Samantha Dixon), for her work on the remediation Bill. The Bill will place stronger legal duties on landlords and freeholders to remediate unsafe cladding and other fire safety defects within clear timeframes. That is very welcome. I am also grateful to her for meeting with me to discuss a number of long-running cases that I face in Putney, and I am glad that the new Minister will continue that important work.
I welcome the work of the remediation enforcement unit, the leadership of Lord Roe, and the work of the Building Safety Regulator, but I do not know why they are causing so many delays. I understand that 69 people work for the remediation unit and 500 people work for the Building Safety Regulator. I ask the Minister to look into their work and find out why they are not able to move so many developments ahead at the pace needed. There are long delays, a lack of clear guidance and a lack of connection between the different bodies involved, as I will demonstrate.
Order. Many colleagues want to speak and we have limited time. Front Benchers will be called at 10.28 am, so I suggest everyone takes four or five minutes for speeches.
I thank the hon. Member for Surrey Heath (Dr Pinkerton) for securing this debate and for the excellent way that he presented the case. This issue causes unbelievable levels of stress for many of our constituents.
We should briefly contrast the complications of getting remedial action to bring about safety and security for our constituents in multiple-ownership private sector developments with the relative speed and efficiency with which local authorities dealt with the problem of cladding after Grenfell. My own borough of Islington surveyed every property immediately, discovered unknown suspect cladding in a couple of places, and got on with it straight away. The issue was resolved very quickly. That was in 2018, but here we are, eight years later, and I have a considerable number of leasehold properties that have been built over the last 20 years or so where the residents, as the hon. Member for Surrey Heath pointed out, want to move on but cannot move or sell, and are paying massive insurance costs.
I say to the Minister that the excessive insurance costs many residents are having to pay are not their fault. The problem should absolutely not be their responsibility; it should be the responsibility of the developers that caused it in the first place. If those developers no longer exist or are not prepared to pay, surely the default position should be that the Government as a whole are prepared to pick up that compensation. People are getting deeply into debt just to insure their own flat, but at the same time cannot move on.
It is a pleasure to serve under your chairmanship, Dr Murrison. I warmly welcome the Minister to her post. I had meetings with most of her predecessors. I do not need to keep having meetings; I just hope that she takes up the points we have raised.
I congratulate the hon. Member for Surrey Heath (Dr Pinkerton) on laying out the issues so clearly—as a result, I have cut my speech in half. Sadly, it is a bit like “Groundhog Day”: we have all raised these issues before. The peroration of the right hon. Member for Islington North (Jeremy Corbyn) summarised the complexity that the Minister and the Government have to grapple with. It is not just the Government who are part of this challenge, but they have to be part of the solution.
I will not name any of the developments that I am talking about, because my residents are very concerned about being blighted. There have been some improvements. The Building Safety Regulator is getting better and the delays have reduced, but as well as dealing with historical issues, it has to work with new developments. Hackney council has a good track record of building council housing, but some of it has been delayed by the Building Safety Regulator. I understand that the delays have now reduced substantially, but I hope the Minister will look closely at that issue in her new role to make sure the Building Safety Regulator is working as efficiently as possible.
It is a pleasure to serve under your chairship, Dr Murrison. I thank my constituency neighbour, my hon. Friend the Member for Surrey Heath (Dr Pinkerton), for securing this debate.
In my Woking constituency, residents have been the direct victims of construction failures. The Victoria Square development, a new shopping centre with two residential towers and another tower containing a hotel, is a glaring example. It was all built by Sir Robert McAlpine. This development was meant to help my town grow and ensure that we can build new homes and grow our economy. Instead, it has put Woking on the map for all the wrong reasons.
The original opening date was meant to be October 2020. However, after cladding failures, it opened at Halloween 2024, and it has continued to be a horror ever since. Cladding panels fell off after the hotel opened, leading to road closures that disrupted local businesses and massively inconvenienced residents in their day-to-day lives. This was next to the town’s main road, an A road. One time the road was closed after being open for just 11 days, because another panel had fallen off.
The road was closed during Christmas, and we all know how important that time of year is for businesses. I asked town centre residents and businesses to tell me how this impacted them. One family-owned restaurant told me its bookings had dropped, and unfortunately it had to cut staff hours. A carers agency said its staff were constantly being delayed in delivering necessary care to vulnerable people, all because Sir Robert McAlpine did not build the building properly in the first place.
I urge the Government to listen to Members present and take the necessary steps to deliver the building safety and accountability that people back home in Woking, and across the country, deserve.
20 of 54 shown
The work undertaken should reflect the risk that the building actually presents, but that approach relies heavily on professional and subjective judgment. Residents need confidence that those judgments are competent, consistent, transparent and properly scrutinised. When assessments of the same building reach different conclusions, remediation can be delayed, funding becomes harder to secure, lenders lose confidence and residents are left wondering whose judgment they can ultimately trust.
There is a particular concern where combustible materials, which would not be permitted on comparable new buildings, are allowed to remain on existing homes. An assessment may conclude that the immediate risk to life is tolerable, but residents could still face higher insurance premiums, difficulty securing a mortgage and a reduction in the value of their property. They may be told that their building meets the required standard, while continuing to feel unsafe and financially trapped.
Royal Artillery Quays clearly illustrates this problem. At this point, I pay tribute to Steve Day, who has been a doughty campaigner for that development and its residents. Many hon. Members might have heard directly from him. Royal Artillery Quays is a large, private residential development in Thamesmead, built by Barratt Homes in 2002, and home to around 1,000 residents. Barratt Homes’s proposed approach there, assessed under PAS 9980, would leave some combustible panels in place, on the basis that the remaining risk is tolerable.
Residents—not unreasonably—remain concerned both about the safety of that approach and its financial consequences. They report that annual service charges have risen from £3,000 to £6,000, with much of that increase linked to insurance. That phenomenon is confirmed by the Association of British Insurers, which in October 2025 reported that buildings remediated only to PAS 9980 may face persistently higher premiums than those remediated to a higher standard. In other words, residents will be paying higher insurance premiums in perpetuity because of decisions that were made not just by this Government but by developers in the past. Some of those residents cannot sell without accepting a substantial reduction in the value of their home. Residents have drawn my attention to a fire safety engineering report that states that leaving the panels in place is
“not the most appropriate fire engineering solution”
for that building. Already there is contestation between the different approaches recommended. Where does that leave residents? The reliability of these decisions ultimately depends on the subjective competence of the people making them.
Will the Minister tell us whether the Government will publish the findings of their audits and reviews of the application of PAS 9980, and what steps are being taken to ensure greater consistency in its use? Where PAS 9980 assessments result in combustible materials remaining in place, how will the consequential impacts on insurance premiums, mortgage availability and property values be assessed and communicated to residents?
The consequences of failure in this area can be immediate. At the Courtyard in Camberley, a couple reported receiving five EWS1 forms that were not accepted before a sixth finally satisfied the relevant requirements. That delay pushed their purchase beyond the stamp duty deadline and left them with an additional bill of nearly £4,500. They had no control over the assessment process, yet bore the cost when it failed. When does the Minister expect statutory regulation of fire engineers to be introduced? Given the degree of subjectivity in PAS 9980 assessments and the potentially life-changing costs passed on to residents, how can leaseholders have confidence in a system that lacks a fully regulated profession?
Failures in assessment can impose substantial costs. The next question is who should be expected to pay them. The Building Safety Act introduced welcome protections and ensured that many leaseholders would no longer be expected to meet the cost of failures that they did not cause. Some non-qualifying leaseholders may also receive support because of their landlord’s responsibility, a developer commitment or the funding arrangements that apply to their building. However, significant gaps remain.
Once a lease is classified as non-qualifying, that status can remain attached to it when the property is sold. Someone buying their first and only home can therefore inherit the consequences of the previous owner’s circumstances and become exposed to significant remediation costs. They had no involvement in the original construction and have no responsibility for the defects, yet under the current system, they can still be left with the bill.
On 10 April 2025, in response to a written question, the then Building Safety Minister said the Government was looking closely at how to
“sunset the ‘in perpetuity’ status of leases which do not qualify for the leaseholder protections.”
Can the Minister update us on that work, and will the Government bring forward proposals to protect those who bought what they reasonably believed would be a safe and secure home?
The Government’s promised remediation Bill provides an opportunity to resolve outstanding problems and turn commitments into delivery. Under their plans, by the end of 2029, buildings over 18 metres should be remediated and buildings from 11 metres to 18 metres should be remediated or firmly scheduled, with 2031 the intended final completion point. Those ambitions are absolutely welcome, but meeting them will require accurate building data, secure funding, skilled contractors, effective independent inspection and, as we have heard today, proper resourcing for agencies across the United Kingdom. It will require costs to be recovered from those responsible, including developers and construction product manufacturers.
Residents have already spent years waiting. Deadlines will mean little unless they are enforceable and backed up by the capacity required to meet them. When will those duties become legally enforceable, and how will the Government ensure that the funding, workforce and regulatory capacity are in place to deliver it?
The lesson of Grenfell is that building safety depends on the whole system working: sound regulation, competent professionals, effective oversight and accountability when things go wrong. When that system fails, danger can remain unaddressed and residents can be left trapped in homes they cannot sell and paying costs they cannot control. Behind every assessment, funding decision and remediation timetable is someone trying to protect their family, preserve their savings or move on to the next stage of their lives.
The bereaved and the survivors of Grenfell deserve justice, and my constituents in Surrey Heath and constituents across the country deserve safe homes and confidence in those entrusted to protect them. More than nine years on, we must take every reasonable step to prevent another loss of life and ensure that those still living with the consequences of this crisis can finally move forward.
I would like to draw the Minister’s attention to several developments that are covered by the developer remediation contract with major developers such as Barratt Redrow and Taylor Wimpey. Despite those contractual commitments, many residents in those developments continue to face lengthy delays before remediation works, which have been agreed and funded, can begin or be completed. In some cases, fire safety remediation has been delayed because structural defects need to be addressed first—if there are problems with the cladding, that often comes with problems with the entire building. In other cases, residents are waiting for final fire risk assessments, EWS1 forms, remediation plans, contractor appointments, updated certifications, smoke extraction systems or the installation of cavity barriers. In all those cases, it is the people in the building who have to chase things up.
One development in my constituency has been waiting for Network Rail to give permission for rear elevation works. Network Rail did not respond to the many repeated efforts by the project team to obtain the permission, so a specialist contractor had to be hired just to get a response, which added a lot of cost for leaseholders.
In another case, many defects have been found at the same time in the buildings of a really large development. Hundreds of families have moved out and moved back, and they have just been told that they will all have to move out again in a rota system, all while fighting for remediation. They have been worried about the safety of their building—they had a waking watch and then they did not—and they cannot sell their homes if they want to, so they cannot get on with their lives. The impact on all those residents of six years of fighting is unacceptable. They cannot sell or remortgage their homes, and they live in uncertainty about when their buildings will finally be made safe.
This is affecting social housing tenants too. For some badly affected social housing in Wandsworth, specifically the Eliot and Wentworth blocks in Wandsworth town, tenants have been waiting for the Building Safety Regulator to give the go-ahead. They cannot have essential kitchen and heating system replacements or other work in the building done until the cladding remediation is completed. The council submitted the application on 31 March. The Building Safety Regulator’s statutory response time for works to existing higher-risk buildings is eight weeks, but it immediately asked for an extension, which is worrying in itself. Here we are in September, and the council is still waiting for a response. The works will take 18 to 24 months. The blocks are in serious need of that repair and the other repairs they are waiting for.
Although I recognise that developers have obligations under the developer remediation contract, my constituents are understandably asking what more can be done by the unit, by Ministers and by the Building Safety Regulator when progress stalls for different reasons. The challenge is not whether a developer has signed up to a contract, but how quickly remediation can move through the assessment, approval and delivery stages, especially when there are other bodies involved.
To conclude, can the Minister explain how the Government intend to support and expedite remediation at developments already covered by the developer remediation contract? What steps can be taken to remove barriers that delay works, to speed up assessments and approvals, and to ensure that developers deliver at pace? The new legislation is very welcome, but leaseholders trapped in affected buildings need to know that existing remediation programmes will also be accelerated. They deserve not only stronger rules for the future in the upcoming Bill, but urgent action on the buildings that have already waited far too long for remediation to be completed.
I want to make some quick points about local issues that I have raised many times with the Government. The first is about the Drayton Park development. I thank the Minister and her predecessors for at last getting to a situation where Government funding has been approved for Galliard Homes to help cover part of the fire remediation costs. I would be grateful if the Minister could assure me how quickly that work will now be completed. It has been subject to endless correspondence between my office, the local authority and many others just to try and get that remedial work done for the properties on Drayton Park in my constituency.
Secondly, there are the works that need to be done for Newlon Housing on the Queensland Road site, which is adjacent to the Arsenal football ground. Remediation works have been delayed, apparently mostly because of delays and complications created by Newlon. Again, I have raised this directly with the Minister and her predecessors, and I would be grateful if she could assure me that that work will now be done. Many lease extensions have been granted over the years, but the complication is that the people living there have not seen the work done. Now their lease is being eaten up as the years go by, and the value of the place is reducing, so they are losing out in lots of ways. That leads on to the wider issue of leasehold reform, but that is not the subject of today’s debate.
The final issue I want to raise is one that I have raised many times in the past, and I am quite unclear where we have reached on it. At Highbury Gardens, where Aviva is the head lessor, there was an issue about wooden railings on balconies that were deemed to be a fire risk. That issue has gone on for a very long time, and once again, the residents are stuck without any certainty about their future.
I will not take much more time, but I will just say that we have a responsibility to get this done quickly. When the fire happened at Grenfell, an enormous shock was felt all over the country. Everything that happened at Grenfell was disgusting and disgraceful—we know that, and we do not want another Grenfell anywhere else. Local authorities have managed, by and large, to get the issue sorted out, but it is the miasma of insurance companies, leaseholders, ultimate freeholders, developers that disappear and go bust, and fire safety engineers who are in short supply or, in many places, non-existent that is the problem. At the end of the day, all the stress lands on our constituents. That is not right or fair and we need to get it sorted.
Skills remain a big issue, and there has been a woeful lack of activity. Some of us were here in 2018 talking about training fire safety engineers. It takes three years to train them, and if anyone had done that then, we would be in a much better place now.
I also wish to mention mortgageability. As recently as 3 September, I had a letter from Baroness Blake of Leeds, repeating what I have had from Ministers of different parties over time: that there are 10 mortgage companies that will lend on property with dangerous cladding. I point that out to constituents and keep referring them to the 10 companies, but there is always a reason why it cannot happen. Those companies obviously have criteria that are often not met. If the Government are routinely sending out that sort of information, it needs to be absolutely accurate.
Insurance is a huge and ongoing problem. For two developments in my constituency, only one insurer took part in the insurance tender process—insurers are just pulling out. The Treasury Committee is keen to look at that issue, but there is a real role for the Government to play. I spoke to the Minister’s predecessors in the previous Government, but this nut has not yet been cracked. I think I speak for every Member in this Chamber when I say that we would be happy to put our weight and effort behind it to help the Minister tackle the issues with insurance companies. We cannot have properties that are effectively uninsurable and bankrupting our residents. As the right hon. Member for Islington North said, people are going into debt to pay their insurance premiums, and that is before they have a claim to make.
The lack of skilled contractors was first raised back in 2020 in a Public Accounts Committee report, when I was Chair of that Committee. We asked for work to be done, but nothing has happened.
The hon. Member for Surrey Heath spoke about tolerability. I have a very expert constituent who came to my advice surgery this summer. I am very happy to introduce the Minister to him. He has written to me and the Department a number of times, and we have had a number of exchanges about the changes in British standards since Grenfell, and specifically about building materials. Instead of having set standards, fire safety is now done on measures of tolerability. He says that there is now a scale of standards, depending on the individual who does the fire safety assessment. That is why, after the Adam Kiziak affair, in which a number of EWS1—external wall system fire review—forms were forged, other people qualified to do the EWS1 certificates came to different conclusions. Two buildings in Hackney that were tolerable were then said to have issues that require remediation.
My constituent said that insurance has become so expensive because the insurers are not certain about the standards, which will no doubt have an impact on mortgage lenders, too. The issue needs to be resolved. I say with respect to the Minister that the solution must be much more fundamental than the Government getting people in, banging heads together and saying, “Sort it out.” This is fundamental to why Grenfell happened in the first place. It was the biggest public safety failure in several generations.
The Department’s permanent secretary at the time spoke to several of her predecessors to find out who could have seen it coming. Changes happened here, there and everywhere, and no one saw what the cumulative impact would be on Grenfell—obviously, there were also other shocking aspects of the Grenfell situation. This is an opportunity for the Minister, who is a very capable woman—we are all delighted to see her in her post—to tackle this issue once and for all. It may not help our residents immediately, but it has to work for the future.
I have several simple asks. Will the Minister get working on the mortgage lender issue and make sure that we are sending out accurate information? Will she work with mortgage lenders not just to get them to sign up to a list saying that they support lending but to be really clear about the criteria that will allow them to lend? Will she look again at insurance and skills, and will she please tackle the issue of tolerability?
Thankfully, the road has now reopened and the cladding panels have now, only recently, been properly secured. Under the common law of negligence, according to the Chartered Institute of Building, purely economic losses are just not recoverable. However, this could be included under contract law. Why is that not standard practice for building projects? Will the Minister and her Department look at making it standard practice as part of forthcoming legislation?
Just a stone’s throw from Victoria Square is another building safety issue in Woking. The Eastgate building has sat abandoned since late 2023, when over 100 residents were evacuated after a report identified significant structural defects. It has been years since then, and the developer says the building is safe. The owner says otherwise. After I got involved last year, independent testing was carried out. Although the testing was completed many months ago, the results still have not been released. There is no way that both sides can be right in this situation. I do not know what they are hiding, but this needs to be resolved immediately. Residents deserve to know what is going on. Does the Minister agree with me that the results of the testing need to be released immediately and that one of the parties must admit it is wrong, whether that means residents being allowed back in and an explanation of why the original structural testing was wrong or the developer needing to rebuild Eastgate and pay compensation?
These two examples from my Woking constituency show the pressing need for stricter oversight, stronger retrospective enforcement and clear accountability for those that are responsible. We live in a country where a university degree is needed to become a lawyer or a teacher, and maybe two to be accredited, so it is shocking that I could go to B&Q, buy some materials and become a cowboy builder tomorrow, without a licence. The construction industry is an unregulated wild west. I know the Federation of Master Builders has been calling on the Government to introduce mandatory licensing and testing for UK construction firms. Does the Minister agree, and will the Government include it in forthcoming legislation? I urge the Government to listen.