The answer is that I will not guarantee to do such a thing but I will reflect, between now and Report, on all the discussions that we are having on these amendments.
As I said, Network Rail is consulting with existing contract holders to establish precisely what amendments may be required across the several hundred existing contracts that will need to be updated to operate under the new framework. It would therefore be undesirable to constrain the power in a way that could prevent necessary changes from being made. Inoperable contracts do not benefit anyone.
My noble friend Lord Berkeley also seeks to limit this power though Amendments 268A, 268 and 269. However, a restriction based on broad and undefined concepts such as the “nature of the bargain” risks creating uncertainty and disputes about whether necessary amendments fall within the scope of the power. We should not allow restrictive drafting to undermine changes agreed to by all the parties. Clearly, that could risk frustrating the very transition that the power at Clause 71 is intended to facilitate. Likewise, imposing an unduly strict test of necessity, as under Amendment 268, would hamper the purpose of the clause, which is to ensure a smooth transition to the new access regime. A test of necessity would also risk creating legal dispute and uncertainty as to whether a particular change is strictly necessary or merely desirable.
On Amendment 269, a number of existing access contracts extend into the mid and late 2030s, far beyond the start of the next funding period in 2029, as proposed in this amendment. It is therefore important that sufficient time is available to ensure that contracts can continue to function effectively throughout their lifetimes. A shorter sunset period could result in the power expiring before issues affecting longer contracts have been fully resolved.
On Amendment 271, the Government strongly support engagement with industry, and, as I have mentioned, extensive consultation is already taking place. Network Rail is currently consulting on draft model access contracts and the future industry codes. Given that that extensive programme of engagement and consultation is currently live and in the public domain, we do not consider it necessary to impose retrospectively a separate statutory consultation requirement in Clause 71 itself, because it is already happening.