HANSARDCommons01 Sept 202653 contributions
Draft Energy Prices Act 2022 (Extension of Time Limit) (No. 2) Regulations 2026
The Committee consisted of the following Members:
Chair: † Sir Desmond Swayne
† Beavers, Lorraine (Blackpool North and Fleetwood) (Lab)
† Billington, Ms Polly (Parliamentary Under-Secretary of State for Energy Security and Net Zero)
† Carling, Sam (North West Cambridgeshire) (Lab)
Cross, Harriet (Gordon and Buchan) (Con)
† Dixon, Anna (Shipley) (Lab)
† Eagle, Maria (Liverpool Garston) (Lab)
Farron, Tim (Westmorland and Lonsdale) (LD)
† Heylings, Pippa (South Cambridgeshire) (LD)
† Jermy, Terry (South West Norfolk) (Lab)
† Jones, Gerald (Merthyr Tydfil and Aberdare) (Lab)
† Jopp, Lincoln (Spelthorne) (Con)
† Poynton, Gregor (Lord Commissioner of His Majesty's Treasury)
† Stuart, Graham (Beverley and Holderness) (Con)
† Sullivan, Dr Lauren (Gravesham) (Lab)
† Thomas, Bradley (Bromsgrove) (Con)
Webb, Chris (Blackpool South) (Lab)
† Witherden, Steve (Montgomeryshire and Glyndŵr) (Lab)
20 of 53 shown